Ezdan Towers
Full duct-work installation across the Ezdan Towers high-rise complex in Dafna, sized and sealed for consistent floor-by-floor airflow.

From high-rise duct-work to airbase cladding, chiller plants to live retail fit-outs — every project below is HVAC, fire-fighting, chilled water or plumbing work carried out and handed over by our in-house team.
Every project here reflects the same in-house standard: engineered airflow, tested fire-fighting lines and chilled water systems that keep running long after handover.
Full duct-work installation across the Ezdan Towers high-rise complex in Dafna, sized and sealed for consistent floor-by-floor airflow.
Fire-fighting systems and duct-work fit-out for the twin Havelá Towers on the Corniche, engineered to code across every residential floor.
Chiller plant integration and duct-work distribution keeping guest floors and back-of-house spaces at the JW Marriott precisely conditioned.
Chiller, fire-fighting and duct-work systems delivered for UDC International School, built around classroom-by-classroom comfort and safety.
Chiller and duct-work systems supporting the rides, retail and back-of-house facilities across Qetifan Island's waterpark development.
A full-scope MEP package for Foxhill — plumbing, chiller, fire-fighting and duct-work — delivered as one coordinated installation.
DX split-unit systems with copper pipe-work runs, paired with fire-fighting installation across residential blocks in Al Saad.
Aluminium cladding and duct-work installation delivered to defence-grade specification and schedule at Al Udeid Airbase.
DX unit fan-coil installation for the Al Erkyah development, tuned for reliable zone-by-zone climate control.
Chilled-water pipeline, FCU and duct-work installation fitted through active retail units inside a live metro station environment.